Four things that go wrong on a Christmas run
Late artwork approval causes most of the Christmas deliveries that miss their date. The other three failures are color drift on a reorder, board that crushes in transit and an insert that doesn’t hold the product.
| What goes wrong | Why it happens | What stops it |
|---|---|---|
| Boxes land after the shelf date | Artwork approval slips and production can’t start without it | Approve the dieline first and finish the outer artwork afterward |
| Red prints differently on the reorder | A deep red built from CMYK shifts between runs and between board stocks | Name a Pantone number in the file instead of a four color mix |
| Corners crush before the box is opened | Paperboard used for a product that needed corrugated | Move to corrugated once the packed weight passes about two pounds |
| The product rattles or won’t go in | Box built to the exact product size with no clearance | Add 3 to 4 mm of clearance on each internal dimension |
Every one of these gets caught by a sample before production starts, which is why we keep sample turnaround short. A run that fails on any of the four costs you the whole season rather than one order. We take the same sample step on every one of our custom printed boxes.
What actually moves your unit price
Quantity moves your unit price further than any other decision you make. The next largest jump comes from how many print colors your design uses.
| Cost driver | What it does to the unit price | What to do about it |
|---|---|---|
| Quantity | The largest single lever. The price break lands at 1,000 units on the same artwork | Order the 1,000 if your forecast supports it because the same die runs either way |
| Print colors | Every extra color adds a plate and a press pass on offset | Build the design on two or three colors and let the board finish do the work |
| Board grade | Heavier board costs more per sheet and more to move | Match the board to the packed weight rather than to the shelf look |
| Special finish | Hot foil and spot UV each add a separate pass | Pick one feature finish rather than layering three |
| Insert | A separate die and a separate material on top of the box | Use a one piece folded insert wherever the product allows it |
Setup and tooling never appear anywhere on your invoice at any quantity. The die and the plates sit inside the unit price on the first order and on every reorder after it. A repeat Christmas run in the same size costs you nothing to restart.
Board and finish that survive a December supply chain
Use 300 to 350 GSM board for a single retail carton and move to corrugated once the packed weight passes roughly two pounds. Weight decides this rather than the look you want on the shelf.
- Under one pound, single retail item: 300 to 350 GSM SBS folding carton
- One to two pounds, gift set or hamper: 350 to 400 GSM SBS
- Premium gifting at any weight: 1.5 to 2 mm greyboard with a printed wrap
- Over two pounds, or shipping on its own: E flute corrugated at 32 ECT
- Several retail units in one outer carton: B flute at 44 ECT
Gold and silver read best as hot foil over uncoated or matte laminated board because a metallic ink printed flat looks closer to mustard than to gold. Spot UV over matte gives you the same contrast for less money when foil doesn’t fit the budget. Soft touch lamination earns its cost on a rigid gift box and rarely earns it on a carton that gets torn open in seconds.
What you get before you commit
A plain physical sample ships in 3 to 5 business days and a printed sample takes 7 to 10. Design support costs you nothing at any stage of the job. We set your own file onto our dieline or build the artwork from scratch without adding either to your invoice.
Send us the product itself if the fit is unusual because a sample built around the real item tells you more than any drawing does. Folding carton and corrugated orders take 8 to 12 business days once you approve the dieline and rigid boxes take 10 to 15.
What to send us to get quoted
Send the internal dimensions in inches or millimeters plus the quantity you need. Tell us the board and finish you have in mind and the date the boxes have to be in your hands. Artwork comes to us as an AI, EPS or PDF file set on our dieline.
- Minimum order: 100 boxes per size and per design
- Production: 8 to 12 business days after dieline approval, 10 to 15 for rigid boxes
- Samples: plain structural sample takes 3 to 5 working days and a printed sample takes 7 to 10.
- Setup and tooling: no charge on the first order or any reorder
- Price break: 1,000 units on the same artwork
- Design support: free at every stage
- Artwork: AI, EPS or PDF on our dieline
- Shipping: free shipping worldwide on all orders



